The Breakers, Sea Point
Rope Worx was sub-contracted by Powercote to renovate the entire building
How did Rope Worx help?
- High Pressure Cleaning
- Structural Repairs
- Painting
- Painting Gutter Interior With Bitumen
- Roof Repairs
Advantage of working with Rope Worx?
Rope access was used to prevent disturbance and damage to landscaped gardens and exclusive tiled areas surrounding the building
NG Kerk, Stellenberg
Rope Worx was contracted to renovate the church tower of the church.
How did Rope Worx help?
- High Pressure Cleaning
- Treated For Fungi & Moss
- Painting of the church to match the existing colour of the heritage building
Advantage of working with Rope Worx?
- As the cost of cherry pickers are extremely high and scaffolding was not an option, rope access was the most cost efficient and safest way to restore the building.
- The project was completed, including the set-up and break-down, in 3 days.
Telkom, Durban Road
Rope Worx was contracted to assist with a hard-to-reach painting job
How did Rope Worx help?
- Painting Of Diagonal Metal Stays
Advantage of working with Rope Worx?
Rope access requires minimal time to set up for a painting job like this one, hence it was the ideal solution
De Waterkant, Greenpoint
How did Rope Worx help?
- High Pressure Cleaning
- Structural Repairs
- Painting
- Metal Work
Advantage of working with Rope Worx?
- By making use of rope access, there was minimal disturbance to the tenants of the building and there was no unsightly scaffolding on the site after working hours.
- The flexibility offered through rope access resulted in vast timesaving on the project
Sentech Guy Rope Greasing, Boesmanskop,
Ladybrand & Napier
Rope Worx was contracted to regrease guy ropes on the towers.
How did Rope Worx help?
- Steel Cables Scraped Clean
- HH Compound Grease Applied By Hand On Cables
Advantage of working with Rope Worx?
- Rope access is the only access method to effectively & efficiently regrease guy ropes on towers.
- Specialised pulley’s were used to complete the project.
- The towers are 215m high and consisted of 15 guys ropes per tower.
Each tower was completed within 5 days, taking into account the extreme height, weather conditions and risk involved in this project
Berghof, Oranjezicht
How did Rope Worx help?
- High Pressure Cleaning
- Installation Of Chemical Bolts
- Structural Repairs
- Painting
- Sealing Of Face Bricks
Advantage of working with Rope Worx?
- As this is a retirement home, the setup of scaffolding posed a security risk. With a rope access solution, residents were protected from possible injury whilst moving around the premises.